East Bay Bike Path Bridges Presentation

May 7, 2021

On May 6 the Town of Warren and Town of Barrington held a joint meeting with RI Department of Transportation to discuss changes to the temporary East Bay Bike Path detour over the Warren River and Barrington River, as well as the permanent plans for replacement of the two bike path bridges.  Both bridges were closed in November, 2019 due to structural deficiencies.  Below you will find a link to the presentation that was given by RIDOT.  

RIDOT EAST BAY BIKE PATH BRIDGE PRESENTATION (5/6/21)